Orot Rabin CCGT power plant - dual power design (1260 MW)

The project to modernise the Orot Rabin plant provided for converting the existing carbon power plant in Adera, Israel to a combined cycle gas power plant with a single-shaft system. Israel Electric Corporation (IEC) currently owns and manages the Orot Rabin plant.
This plant should become the largest and most efficient gas fired power plant in Israel and it is expected to supply up to 4% of the current total energy generation capacity in the country.