Engineering

Process
Engineering


Main activities developed

  • Site survey
  • Consultancy and feasibility study
  • Process Design Data Book (system operational capability, technology description, process unit description, site environmental conditions, consumptions and characteristics of raw materials,
    utilities characteristics and relevant energy consumption, preliminary plant layout)
  • Energy and materials balance
  • Fluids list with specified design conditions and materials requirements
  • PFD (Process Flow Diagrams)
  • P&ID (Piping & Instrumentation Diagrams)
  • Equipment sizing, control instrument and safety equipment
  • Piping Specifications
  • Plant Operation Manual
  • Technical specifications for purchase and request for technical proposal
  • Evaluation and technical alignment of technical bids
  • Economic evaluation of the works
  • Operation management and works supervision
  • Pre-commissioning, commissioning, Plants Start-Up

Software:

  • ASPEN TECH (chemical process simulation)
  • Intergraph Corporation Smart Plant P&ID
  • Intergraph Corporation CADWorx P&ID Professional
Learn More

Electrical
Engineering


Main activities developed

  • Site survey
  • System verification w.r.t standards and regulations compliance
  • HV Transmission lines
  • MV/LV Electrical cabins
  • PCC (Power Control Centre) and MCC (Motor Control Centre)
  • Electric Switchboards, Circuit breaker selection and power lines sizing
  • Lighting plants and Lighting calculations
  • Electric power lines sizing and relevant protection coordination
  • Earthing systems
  • LPS (Lightning Protection Systems)
  • Cathodic protection systems
  • Sound diffusion systems and EVAC (Emergency Voice and Communication)
  • UPS (Uninterruptible Power Supply) systems and Electric generator systems
  • Technical specifications for purchase and request for technical proposal, evaluation and technical alignment of technical bids
  • MTO (Material Take Off) and BOQ (Bill of quantities)
  • Economic quantification of the works
  • Operation management and works supervision
  • Pre-commissioning, commissioning, Plants Start-Up

Software:

  • Integraph Corporation Smart Plant Electrical
  • Autodesk Revit (BIM)
  • ETAP (Electrical Power System Analysis & Operation Software)
  • Electrographics, Ampere Professional (Sizing and Electrical Calculations)
  • Electrographics, Smart Automation (Design Optimization in computer)
  • Dialux (Lighting calculations)
  • ATEX Gas e Polveri TNE (Hazardous Area Classification)
  • ZEUS 2 (Lightning Protection System)
  • ACCA Software, Primus (Accounting)
Learn More

Instrumental
Engineering


Main activities developed

  • Site survey
  • Data sheets of valves, metering, control and safety instruments
  • Positioning layout of instruments, junction boxes, compressed air distributors
  • Cable trays paths layouts
  • Control room layout
  • Cables list
  • Hook-up drawings: pneumatic and electrical (primary and secondary)
  • Loop diagrams Data sheet: junction boxes, instrumentation cables, instrumentation equipment, etc.
  • Intrinsically Safe Loop verification
  • Switchboards of electromechanical (relay) safety interlocks
  • Pre-commissioning protocol
  • Punch list
  • Technical specifications for purchase and request for technical proposal
  • Evaluation and alignment of technical bids
  • MTO (Material Take Off)
  • BOQ (Bill of quantities)
  • Economic quantification of the works
  • Operation management and works supervision
  • Pre-commissioning, commissioning, Plants Start-Up

 

Software:

  • AVEVA Instrumentation
  • Intergraph Corporation Smart Plant Instrumentation (ex: INTOOLS)
  • Instrucalc (Sizing of regulation Valves and Flow rate elements)
  • CONVAL (Valves Sizing)
Learn More

Automation and Control
Engineering

Main activities developed

  • Site survey
  • Functional specifications of automation / control systems
  • Cause-Effect Analysis diagrams/tables
  • DCS I/O and Interlocks signals list
  • PLC (Programmable Logic Controller), DCS (Distributed Control Systems), ESD (Emergency Shutdown System), F&G (Fire & Gas), SIL (Safety Integrity Level), PCS (Process Control System)
  • RTU (Remote Terminal Unit) systems
  • Automation and control logic diagrams development
  • Process synoptic graphic pages
  • Technical specifications for purchase and request for technical proposal
  • Evaluation and alignment of technical bids
  • MTO (Material Take Off)
  • BOQ (Bill of quantities)
  • Economic quantification of the works
  • Operation management and works supervision
  • Pre-commissioning, commissioning, Plants Start-Up

 

Software:

  • AVEVA Instrumentation
  • Intergraph Corporation Smart Plant Instrumentation (ex: INTOOLS)
  • Instrucalc (Sizing of regulation Valves and Flow rate elements)
  • CONVAL (Valves Sizing)
Learn More

Telecommunications
Engineering


Main activities developed

  • Site survey
  • PABX (Private Automatic Branch exchange) systems
  • PAGA (Public Address General Alarm) systems
  • TETRA (Terrestrial Trunked Radio) systems • GPS (Global Position System) systems
  • UHF/VHF systems
  • LAN (Local Area Network) systems
  • VOIP (Voice Over IP) systems
  • TV Entertainment systems
  • TVCC (Close Circuit TV) systems
  • TV-Sat systems
  • Antenna systems
  • Technical specifications for purchase and request for technical proposal
  • Evaluation and alignment of technical bids
  • MTO (Material Take Off)
  • BOQ (Bill of quantities)
  • Economic quantification of the works
  • Operation management and works supervision
  • Pre-commissioning, commissioning, Plants Start-Up

 

Software:

  • AVEVA Instrumentation
  • Intergraph Corporation Smart Plant Instrumentation (ex: INTOOLS)
  • Instrucalc (Sizing of regulation Valves and Flow rate elements)
  • CONVAL (Valves Sizing)
Learn More

Mechanical and Piping
Engineering

Main activities developed

  • Site survey
  • Equipment Data Sheets (tanks, vessels, columns, heat exchangers, etc.)
  • Lines List
  • Pressure Equipment Sizing conforming to PED (Pressure Equipment Directive)
  • Equipment layout
  • 2D and 3D Pipe routing design, equipment nozzles orientation definition
  • Isometric Drawings (Sketch)
  • Stress Analysis
  • Coating and insulation technical specifications preparation
  • Technical specifications for purchase and request for technical proposal, evaluation and alignment of technical bids
  • MTO (Material Take Off)
  • BOQ (Bill of quantities), economic evaluation of the works
  • Operation management and works supervision
  • Pre-commissioning, commissioning, Plants Start-Up

 

Software:

  • Autocad (Various Releases)
  • Autodesk Revit (BIM)
  • Microstation J Bentley
  • Aveva PDMS (3D Modelling)
  • CAESAR II (Stress analysis)
  • PUMA/ECOS: piping MTO
  • Navisworks Jets ream
  • Integraph Corporation PDS (3D Modelling)
  • Integraph Corporation CADWorx Plant Professional
  • Integraph Corporation Isogen
  • Integraph Corporation PV Elite
  • DWG Trueview
Learn More

Civil and Structural
Engineering


Main activities developed

  • Site Survey
  • Structural calculations (reinforced concrete elements, metallic structures, etc.)
  • Stress and deformation analyses of the structures
  • Structural limit state analysis
  • Structures instability analysis
  • Foundations loads calculations
  • CoG (center of gravity) calculations
  • Definition of lifting schemes/technical procedures
  • Assembly and detail drawings of main metallic structures
  • Assembly and detail drawings of secondary metallic structures (stairs, balconies, walkways, railings, etc.)
  • Bureaucratic procedures for building permits
  • Value estimations, cadastral (land registry) certificates and procedures, fractioning documentation, cadastral (land registry) stacking and servitude procedures, services for expropriation procedures
  • Safety coordination during design and/or execution phases
  • Technical specifications for purchase and request for technical proposal
  • Evaluation and alignment of technical bids
  • MTO (Material Take Off)
  • BOQ (Bill of quantities), economic quantification of the works
  • Operation management and works supervision
  • Pre-commissioning, commissioning, Plants Start-Up

 

Software:

  • Tekla Structures 14 Full Detailing
  • SAP 2000
  • STAAD3
Learn More

Plumbing & HVAC
Engineering

Main activities developed

  • Site survey
  • System verification in compliance with Italian Ministerial Decree 37/08 and Italian Legislative Decree 81/08
  • Heating and air conditioning systems
  • Air conditioning and ventilation, sanitary water systems, firefighting systems, Solar water heating systems
  • Assistance in the tender for contractor selection
  • Cogeneration systems
  • Rain water collection and recovery
  • Technical advice on regulations in force
  • Exhaust fumes and technical gases
  • Methane and industrial gas systems
  • Heating and refrigerating systems
  • Lawn irrigation
  • Control and adjustment systems
  • Technical specifications for the purchase and requests for quotations
  • Evaluation and alignment of technical bids
  • BOQ (Bill of quantities), economic quantification of the works
  • Operation management and works supervision
  • Pre-commissioning, commissioning, Plants Start-Up

 

Software:

  • Autocad (Various Releases)
  • Autodesk Revit (BIM)
  • Edilclima (Energy performance of buildings)
  • Energy Plus (Energy performance of buildings)
  • ACCA Software, Primus (Accounting)
Learn More

Renewable
Energies


Main activities developed

  • Site survey: Solar, Photovoltaic, Biomass, Geothermal, Hydroelectric, Wind plants
  • System verification in compliance with regulations in force
  • Preliminary projects for request of authorizations
  • Detailed construction design
  • Clamping system design
  • Technical advice on regulations in force
  • Technical specifications for the purchase and requests for bids
  • Evaluation and alignment of technical offers
  • BOQ (Bill of quantities), economic quantification of the works
  • Operation management and works supervision
  • Pre-commissioning, commissioning, Plants Start-Up
  • Advice and assistance for the preparation of documents necessary to obtain incentives

Software:

  • PV configurator (Photovoltaic Analysis)
  • Acca Software, Solarius-PV (Photovoltaic Analysis)
  • PV Syst 6 Premium (Photovoltaic Analysis)
Learn More

Energy
Auditing


Main activities developed

  • Survey of the housing and facilities
  • Analysis of the building, of opaque surfaces, transparent and floors dispersants
  • Production of Energy Diagnosis made to the standard required by the UNI CEI / TR 11428
  • Verification of the energy needs and the degree of energy efficiency
  • Analysis of energy consumption
  • Analysis of energy efficiency rate
  • Study of efficiency energy rate of the systems
  • Estimation of the potential advantages and costs of intervention, financial assessment
  • Support from local authorities and private companies for procedures aimed at energy planning and installation of optimal production systems
  • Advice and assistance for the preparation of documents necessary to obtain white certificates and other state facilities
  • Energy certification of technical reports and editorial specialist (Law 10)
  • Technical management of the work
  • Assistance at Certifying Organizations (Leed, Casaclima, etc.) for the procedures to energy certification
Learn More

Fire Detection


Main activities developed

  • Site survey
  • Technical Data Sheets of equipment for detection, warning and fire extinguishing
  • Structure adaptation plan in compliance with specific fire regulations and guidelines (not specifically regulated)
  • Project verification request to the Fire Department for obtaining the Fire-safety Compliance declaration
  • Technical Documentation: processing and preparation of the technical report and the drawings in compliance with local regulations
  • Fire Resistance Certifications of structure
  • Sworn confirming compliance with the applicable regulations in fire safety
  • Renewal of the Fire Prevention Certification for existing activities
  • Evacuation plans in compliance with Italian Ministerial Decree dated 10 March 1998
  • Operation management and works supervision
  • Pre-commissioning, commissioning, Plants Start-Up

 

Software:

  • Namirial CPI Win (Fire Fighting)
Learn More

Environment and
Safety


Acoustics

  • Design of passive acoustic requisites for buildings in compliance with Decree of the President of the Council of Ministers dated 05-12-1997 implementing the framework law on noise pollution  No. 447 dated 26/10/1998
  • Evaluation of acoustic requirements for internal sound sources (technological systems)
  • Sound insulation testing

Construction site safety

  • Design and execution stages coordination Safety on the workplace
  • Risk exposure evaluation

Electromagnetic impact measures and consultancy

  • Measures of exposure to various sources of electromagnetic fields both in the civil and industrial sectors

Hazardous area classification

  • Classification of hazardous areas according to applicable regulations and standards
Learn More